Zewail City of Science and Technology

Project case study

Zewail City Of Science And Technology

6th of October City, Giza, Egypt

Indicative period · 2016–2020Campus-wide envelope
Explore the case study
CHEMA FOAM / 01Project gallery03
Sector
Education
Location
6th of October City, Giza, Egypt
Materials
XPS
Project partners
ACE · EAOTAF

Zewail City of Science and Technology is presented as an engineering case study in 6th of October City, Giza, Egypt. Research laboratories and teaching buildings require continuity between controlled interiors, exposed roofs and shaded campus circulation. Chema Foam materials include XPS, with project partners Zewail City of Science and Technology · ACE · EAOTAF. The architectural reading centres on academic roof assemblies / laboratory service interfaces / perimeter thermal continuity. These zones describe a coordinated design scope rather than an as-built quantity, connecting the project’s spatial character to practical decisions about insulation, protection layers and the long-term accessibility of adjoining construction.

Scope of application

  • Academic roof assemblies
  • Laboratory service interfaces
  • Perimeter thermal continuity
XPS
Zewail City of Science and Technology — architecture and site details
Zewail City of Science and Technology↗
6th of October City, Giza, Egypt
Location
Campus-wide envelope
Project scope
XPS
Materials

Dates and application zones are indicative and should be checked against the final project design.

At Zewail City of Science and Technology, continuity at the interfaces matters as much as the insulation itself. Different indoor requirements sets the coordination priority.

6th of October City, Giza, Egypt · Campus-wide envelope

Research laboratories and teaching buildings require continuity between controlled interiors, exposed roofs and shaded campus circulation. For Zewail City of Science and Technology, the main constraints are different indoor requirements / dense service penetrations / maintainable campus details. Each condition affects how an insulation layer meets adjacent construction, especially at changes of level, penetrations and exposed edges. The team working with Zewail City of Science and Technology · ACE · EAOTAF needs coordinated construction details before follow-on work conceals those interfaces. Moisture control, load transfer and safe access therefore belong in the detail review, with application-specific limits checked against drawings rather than inferred from the material name alone.

  1. 01Different indoor requirements
  2. 02Dense service penetrations
  3. 03Maintainable campus details

Chema Foam materials include XPS for Zewail City of Science and Technology. Closed-cell XPS offers moisture-resistant rigid insulation; thickness, thermal conductivity, compression and fire compatibility must match the approved assembly. The proposed technical reading focuses on academic roof assemblies / laboratory service interfaces / perimeter thermal continuity, linking each zone to substrate preparation and adjacent protection layers. Coordination with Zewail City of Science and Technology · ACE · EAOTAF should distinguish insulation from waterproofing: joints and membranes need their own compatible details, and are not additional confirmed supplies. A continuous thermal line, appropriate service loading and maintainable transitions provide a stronger specification basis than a single headline product property.

The material solution
Performance priorities

Zewail City of Science and Technology illustrates how campus-wide envelope depends on coordinated interfaces as well as material selection. Research laboratories and teaching buildings require continuity between controlled interiors, exposed roofs and shaded campus circulation. The intended outcome is continuity across academic roof assemblies, reduced vulnerability at junctions and a maintainable assembly. Coordination between the project partners supports a coherent architectural outcome. These are engineering priorities, not claimed measured energy savings: final thermal resistance, compression performance and moisture behaviour require approved grades, installed thicknesses and project-specific inspection evidence.

Specification priorities

Closed-cell XPS offers moisture-resistant rigid insulation; thickness, thermal conductivity, compression and fire compatibility must match the approved assembly.

Implementation of Zewail City of Science and Technology links architectural intentions to durable, buildable construction details. The workflow starts with academic roof assemblies, then resolves different indoor requirements through coordinated drawings and material review. Deliveries should retain batch and grade identification, with protected storage and sequenced release to each work front. Before covering the work, inspect joints, cuts, levels and adjoining protection; record exceptions and corrective actions so later trades can proceed against clear, coordinated construction details.

  • 03

    Surface Seal & Protection

  • 02

    Chema Foam Core (PE / EPE / PU)

  • 01

    Prepared Structural Substrate

01

Define the application

Review academic roof assemblies at Zewail City of Science and Technology; establish different indoor requirements and issue the drawing interfaces for review.

02

Review the material dossier

Match XPS to the project’s application requirements. Review the grade, dimensions, test documentation and constraints with Zewail City of Science and Technology · ACE · EAOTAF.

03

Coordinate the interfaces

Resolve laboratory service interfaces and dense service penetrations. Agree protection, storage and release sequencing before the next trade closes the assembly.

04

Inspect and document

Check perimeter thermal continuity against the agreed details. Record batch identity, visible defects and corrective actions for Zewail City of Science and Technology before covering the work.

Developer / owner

Zewail City of Science and Technology

Consultant

ACE

Contractor

EAOTAF

Continue exploring.

All projects
Next case study

Engineering Authority of the Armed Forces

BUILDING TOGETHER

Let’S Plan Your Next Project.

Share your application, quantities and project location to discuss the next step.

Request a quote

Frequently asked questions

What challenge did the Zewail City of Science and Technology project address?

Research laboratories and teaching buildings require continuity between controlled interiors, exposed roofs and shaded campus circulation. For Zewail City of Science and Technology, the main constraints are different indoor requirements / dense service penetrations / maintainable campus details. Each condition affects how an insulation layer meets adjacent construction, especially at changes of level, penetrations and exposed edges. The team working with Zewail City of Science and Technology · ACE · EAOTAF needs coordinated construction details before follow-on work conceals those interfaces. Moisture control, load transfer and safe access therefore belong in the detail review, with application-specific limits checked against drawings rather than inferred from the material name alone.

Where is the Zewail City of Science and Technology project located?

6th of October City, Giza, Egypt

Which materials are documented for Zewail City of Science and Technology?

XPS - Blue Foam, XPS

How can I find a project similar to mine?

Use the project categories and compare the scope and application in the case studies.

Can I use a case study as a specification?

Use it to understand the documented application. Verify the materials, dimensions and details for your own project.

All questions