Project overview
NEWGIZA is presented as an engineering case study in 6th of October City, Giza, Egypt. EPS supports a development where stepped building levels complicate repetitive envelope details. Chema Foam materials include EPS, with project partners NewGiza · Degla Project Mangment · Alhazek · DEGLA - ECG · Alshams · Redcon Con.. The architectural reading centres on roof insulation continuity / parapet and terrace interfaces / protected slab transitions. These zones describe a coordinated design scope rather than an as-built quantity, connecting the project’s spatial character to practical decisions about insulation, protection layers and the long-term accessibility of adjoining construction.
Scope of application
- Roof insulation continuity
- Parapet and terrace interfaces
- Protected slab transitions

- 6th of October City, Giza, Egypt
- Location
- Residential envelope programme
- Project scope
- EPS
- Materials
Dates and application zones are indicative and should be checked against the final project design.
The challenge
At NEWGIZA, continuity at the interfaces matters as much as the insulation itself. Repeated block phasing sets the coordination priority.
6th of October City, Giza, Egypt · Residential envelope programme
EPS supports a development where stepped building levels complicate repetitive envelope details. For NEWGIZA, the main constraints are repeated block phasing / summer solar exposure / protection before follow-on trades. Each condition affects how an insulation layer meets adjacent construction, especially at changes of level, penetrations and exposed edges. The team working with NewGiza · Degla Project Mangment · Alhazek · DEGLA - ECG · Alshams · Redcon Con. needs coordinated construction details before follow-on work conceals those interfaces. Moisture control, load transfer and safe access therefore belong in the detail review, with application-specific limits checked against drawings rather than inferred from the material name alone.
- 01Repeated block phasing
- 02Summer solar exposure
- 03Protection before follow-on trades
The material solution
Chema Foam materials include EPS for NEWGIZA. EPS brings lightweight insulation with density selected for the intended load; thickness, thermal conductivity, compression and fire compatibility must match the approved assembly. The proposed technical reading focuses on roof insulation continuity / parapet and terrace interfaces / protected slab transitions, linking each zone to substrate preparation and adjacent protection layers. Coordination with NewGiza · Degla Project Mangment · Alhazek · DEGLA - ECG · Alshams · Redcon Con. should distinguish insulation from waterproofing: joints and membranes need their own compatible details, and are not additional confirmed supplies. A continuous thermal line, appropriate service loading and maintainable transitions provide a stronger specification basis than a single headline product property.
The material solutionNEWGIZA illustrates how residential envelope programme depends on coordinated interfaces as well as material selection. EPS supports a development where stepped building levels complicate repetitive envelope details. The intended outcome is continuity across roof insulation continuity, reduced vulnerability at junctions and a maintainable assembly. Coordination between the project partners supports a coherent architectural outcome. These are engineering priorities, not claimed measured energy savings: final thermal resistance, compression performance and moisture behaviour require approved grades, installed thicknesses and project-specific inspection evidence.
Chema White
Chema White is expanded polystyrene (EPS) foam used for multiple applications such as expansion joint and void filling and wall thermal insulation.
View productSpecification priorities
EPS brings lightweight insulation with density selected for the intended load; thickness, thermal conductivity, compression and fire compatibility must match the approved assembly.
Implementation
Implementation of NEWGIZA links architectural intentions to durable, buildable construction details. The workflow starts with roof insulation continuity, then resolves repeated block phasing through coordinated drawings and material review. Deliveries should retain batch and grade identification, with protected storage and sequenced release to each work front. Before covering the work, inspect joints, cuts, levels and adjoining protection; record exceptions and corrective actions so later trades can proceed against clear, coordinated construction details.
- 03
Surface Seal & Protection
- 02
Chema Foam Core (PE / EPE / PU)
- 01
Prepared Structural Substrate
Define the application
Review roof insulation continuity at NEWGIZA; establish repeated block phasing and issue the drawing interfaces for review.
Review the material dossier
Match EPS to the project’s application requirements. Review the grade, dimensions, test documentation and constraints with NewGiza · Degla Project Mangment · Alhazek · DEGLA - ECG · Alshams · Redcon Con..
Coordinate the interfaces
Resolve parapet and terrace interfaces and summer solar exposure. Agree protection, storage and release sequencing before the next trade closes the assembly.
Inspect and document
Check protected slab transitions against the agreed details. Record batch identity, visible defects and corrective actions for NEWGIZA before covering the work.
Project partners
NewGiza
Degla Project Mangment
DEGLA - ECG
Alhazek
Alshams
Redcon Con.
The project, in focus.
Jewel of the Capital
BUILDING TOGETHER
Let’S Plan Your Next Project.
Share your application, quantities and project location to discuss the next step.