Il Mondo

Project case study

Il Mondo

New Administrative Capital, Egypt

Indicative period · 2020–2023Residential envelope programme
Explore the case study
CHEMA FOAM / 19Project gallery01
Sector
Residential
Location
New Administrative Capital, Egypt
Materials
EPS
Project partners
Space Consultant · Rafco

Il Mondo is presented as an engineering case study in New Administrative Capital, Egypt. Compact residential blocks rely on lightweight EPS packages and precise cutting at roof edges to preserve a coherent thermal envelope. Chema Foam materials include EPS, with project partners Rafco Developments · Space Consultant · Rafco. The architectural reading centres on roof insulation continuity / parapet and terrace interfaces / protected slab transitions. These zones describe a coordinated design scope rather than an as-built quantity, connecting the project’s spatial character to practical decisions about insulation, protection layers and the long-term accessibility of adjoining construction.

Scope of application

  • Roof insulation continuity
  • Parapet and terrace interfaces
  • Protected slab transitions
EPS

Dates and application zones are indicative and should be checked against the final project design.

At Il Mondo, continuity at the interfaces matters as much as the insulation itself. Repeated block phasing sets the coordination priority.

New Administrative Capital, Egypt · Residential envelope programme

Compact residential blocks rely on lightweight EPS packages and precise cutting at roof edges to preserve a coherent thermal envelope. For Il Mondo, the main constraints are repeated block phasing / summer solar exposure / protection before follow-on trades. Each condition affects how an insulation layer meets adjacent construction, especially at changes of level, penetrations and exposed edges. The team working with Rafco Developments · Space Consultant · Rafco needs coordinated construction details before follow-on work conceals those interfaces. Moisture control, load transfer and safe access therefore belong in the detail review, with application-specific limits checked against drawings rather than inferred from the material name alone.

  1. 01Repeated block phasing
  2. 02Summer solar exposure
  3. 03Protection before follow-on trades

Chema Foam materials include EPS for Il Mondo. EPS brings lightweight insulation with density selected for the intended load; thickness, thermal conductivity, compression and fire compatibility must match the approved assembly. The proposed technical reading focuses on roof insulation continuity / parapet and terrace interfaces / protected slab transitions, linking each zone to substrate preparation and adjacent protection layers. Coordination with Rafco Developments · Space Consultant · Rafco should distinguish insulation from waterproofing: joints and membranes need their own compatible details, and are not additional confirmed supplies. A continuous thermal line, appropriate service loading and maintainable transitions provide a stronger specification basis than a single headline product property.

The material solution
Performance priorities

Il Mondo illustrates how residential envelope programme depends on coordinated interfaces as well as material selection. Compact residential blocks rely on lightweight EPS packages and precise cutting at roof edges to preserve a coherent thermal envelope. The intended outcome is continuity across roof insulation continuity, reduced vulnerability at junctions and a maintainable assembly. Coordination between the project partners supports a coherent architectural outcome. These are engineering priorities, not claimed measured energy savings: final thermal resistance, compression performance and moisture behaviour require approved grades, installed thicknesses and project-specific inspection evidence.

Chema White

Chema White is expanded polystyrene (EPS) foam used for multiple applications such as expansion joint and void filling and wall thermal insulation.

View product

Specification priorities

EPS brings lightweight insulation with density selected for the intended load; thickness, thermal conductivity, compression and fire compatibility must match the approved assembly.

Implementation of Il Mondo links architectural intentions to durable, buildable construction details. The workflow starts with roof insulation continuity, then resolves repeated block phasing through coordinated drawings and material review. Deliveries should retain batch and grade identification, with protected storage and sequenced release to each work front. Before covering the work, inspect joints, cuts, levels and adjoining protection; record exceptions and corrective actions so later trades can proceed against clear, coordinated construction details.

  • 03

    Surface Seal & Protection

  • 02

    Chema Foam Core (PE / EPE / PU)

  • 01

    Prepared Structural Substrate

01

Define the application

Review roof insulation continuity at Il Mondo; establish repeated block phasing and issue the drawing interfaces for review.

02

Review the material dossier

Match EPS to the project’s application requirements. Review the grade, dimensions, test documentation and constraints with Rafco Developments · Space Consultant · Rafco.

03

Coordinate the interfaces

Resolve parapet and terrace interfaces and summer solar exposure. Agree protection, storage and release sequencing before the next trade closes the assembly.

04

Inspect and document

Check protected slab transitions against the agreed details. Record batch identity, visible defects and corrective actions for Il Mondo before covering the work.

Developer / owner

Rafco Developments

Consultant

Space Consultant

Contractor

Rafco

Continue exploring.

All projects
Next case study

Badr Egypt Housing Basic Education School

BUILDING TOGETHER

Let’S Plan Your Next Project.

Share your application, quantities and project location to discuss the next step.

Request a quote

Frequently asked questions

What challenge did the Il Mondo project address?

Compact residential blocks rely on lightweight EPS packages and precise cutting at roof edges to preserve a coherent thermal envelope. For Il Mondo, the main constraints are repeated block phasing / summer solar exposure / protection before follow-on trades. Each condition affects how an insulation layer meets adjacent construction, especially at changes of level, penetrations and exposed edges. The team working with Rafco Developments · Space Consultant · Rafco needs coordinated construction details before follow-on work conceals those interfaces. Moisture control, load transfer and safe access therefore belong in the detail review, with application-specific limits checked against drawings rather than inferred from the material name alone.

Where is the Il Mondo project located?

New Administrative Capital, Egypt

Which materials are documented for Il Mondo?

Chema White, EPS

How can I find a project similar to mine?

Use the project categories and compare the scope and application in the case studies.

Can I use a case study as a specification?

Use it to understand the documented application. Verify the materials, dimensions and details for your own project.

All questions