Cornices & Roofline Profiles
Shape lightweight cornices and roofline details to the architectural profile. Coordinate anchor positions, top protection and drip edges to shed rain away from the facade.

LIGHTWEIGHT ARCHITECTURAL ENVELOPE SYSTEMS
Coordinate EPS facade insulation, lightweight Fomina architectural profiles and reinforced XBoard alternatives. XBoard has a 32–33 kg/m³ XPS core, thermal conductivity 0.032 W/(m·K), and a mesh-reinforced cementitious facing. Chema Adhesive 102 is C2TE; Smart Coat is a cementitious smoothing putty applied before paint.
System & approach
Facade elements experience alternating solar heating, wind suction and wetting at every opening and termination. Weak substrates or discontinuous bonding allow local movement, while missing diagonal reinforcement concentrates cracking at window corners. If flashings, drip edges and movement joints are interrupted, water can travel behind decorative profiles and damage the bond rather than draining onto the exterior.
Choose EPS or reinforced XBoard as the approved assembly requires, then design the bonding and fixings. The XBoard TDS lists Adhesive 102, screws or anchors, joint filler and waterproof sealing tape. Smart Coat requires 8–9 L water per 25 kg and gives theoretical coverage of 12–15 m² at 1 mm; apply the separately specified paint after preparation.
SYSTEM COMPONENTS
Locate the Foamina profile above the window, the bright white Ultra Light wall coating, the adhesive zone and the cement-faced XBOARD panels.

Select a numbered component to review its role, specification and related products.
01 · FOAMINA
A lightweight decorative profile forms the cornice above the window.
Shape lightweight cornices and roofline details to the architectural profile. Coordinate anchor positions, top protection and drip edges to shed rain away from the facade.
Create consistent surrounds with accurate corner cuts and aligned joints. Detail sills, heads and perimeter seals without bridging movement joints.
Coordinate external insulation boards with the approved facade assembly. Specify basecoat reinforcement, opening details and fire barriers as required by the project.
Renew facade geometry and coatings while checking the condition of the existing support. Repair unstable areas and test adhesion before fixing profiles or insulation.
Lightweight architectural profiles
Lightweight decorative cladding and architectural decoration system for exterior and interior use.
For cornices, surrounds and custom architectural reliefs detailed to the drawings. System: Lightweight exterior decorative elements Applications: Architectural facade profiles
Facade insulation board
Lightweight XPS board with fiberglass-reinforced cementitious faces for insulation, cladding, partitions and finishes.
For external insulation integrated into a specified, compatible facade assembly. Core density: 32–33 kg/m³ Core compressive strength: ≥ 500 kPa
C2TE · EN 12004
C2TE single-component cementitious tile adhesive, mixed with water.
For bonding insulation boards in the approved facade assembly. Mix 3–3.5 L water per 20 kg; open time is 45 minutes at 25 °C. Mechanical fixing follows the project design.
Polymer-modified cementitious putty
Polymer-modified cementitious putty for smoothing walls and ceilings before painting.
For smoothing concrete or plaster before painting, indoors or outdoors. Mix 8–9 L water per 25 kg; working time is 30–40 minutes at 25 °C and theoretical coverage is 12–15 m² at 1 mm.
Check support soundness and measure openings and levels. Approve profile drawings, fixing details and a facade sample before production.
Clean and repair the substrate, then apply the specified adhesive. Align boards or profiles and install the designed mechanical fixings.
Complete joints, corner treatment and the required protective coat. Preserve movement joints and inspect flashings and drip details.
Allow the basecoat to cure before applying Smart Coat. Check finish continuity, fixing concealment and weatherproof terminations.
Madinaty, East Cairo, EgyptMadinaty, East Cairo, Egypt
A phased urban extension needs repeatable roof insulation details that can move between residential packages without losing junction quality.
View the case studyBUILDING TOGETHER
Share your application, quantities and project location to discuss the next step.
They are lightweight architectural profiles rather than structural supports. Design their bonding and anchorage for self-weight, wind and the condition of the supporting wall.
No: factory-coated Foamina profiles and site-built EIFS assemblies may use different protective systems. Follow the approved product and facade details for mesh, overlaps and opening reinforcement.
First assess coating adhesion and substrate stability. Remove unsound paint and contamination, repair defects and test the specified bonding system before installation.
Continue movement joints through the facade assembly and specify compatible seals. Coordinate flashings, sills and drip edges so water drains outward instead of behind profiles.
Coordinate EPS facade insulation, lightweight Fomina architectural profiles and reinforced XBoard alternatives. XBoard has a 32–33 kg/m³ XPS core, thermal conductivity 0.032 W/(m·K), and a mesh-reinforced cementitious facing. Chema Adhesive 102 is C2TE; Smart Coat is a cementitious smoothing putty applied before paint.