The challenge
Tank joints and internal surfaces need a system matched to the intended water use.
The approach
Review substrate condition, water-contact requirements and the complete lining specification with the technical team.
Planning checklist
- Define the application, substrate and exposure.
- Review drawings, joints and service interfaces.
- Read product documents and discuss suitability with technical support.
- Confirm quantities, work sequence and inspection points.
Materials to review
Chema Proof 107
A semi-flexible, fiberglass-modified system for general waterproofing.
Chema Proof 109
Elastic cementitious waterproofing with advanced fiberglass reinforcement.